1op87 modelwereld

 
  • Increase font size
  • Default font size
  • Decrease font size
Home about model cars Stadtwerke part 2

Stadtwerke part 2

E-mail Print PDF
Article Index
Stadtwerke part 2
Steering
assembling the motor
The final result
All Pages

The second part of the building report of the Stadtwerke bus. In the previous part I described the lights, this time the mechanics.

The floor of a Rietze bus is prepared to make room for the battery holder. The chair stands are cut of with a knife. In the end some of the chairs will be but back including some passengers.

A nice fit. This is a double AAA holder. You will have to do some searching to find this at a reasonable price. I have seen prices up to € 4,50. This one costs € 0,35.

The holder does not hold very well with glue. I needed two extra strips to get some structural strength. I also sanded the bottom of the holder. It was not not completely flat.



Last Updated ( Monday, 28 September 2009 23:44 )