| Article Index |
|---|
| Stadtwerke part 2 |
| Steering |
| assembling the motor |
| The final result |
| All Pages |
Page 1 of 4
The second part of the building report of the Stadtwerke bus. In the previous part I described the lights, this time the mechanics.
The floor of a Rietze bus is prepared to make room for the battery holder. The chair stands are cut of with a knife. In the end some of the chairs will be but back including some passengers.
A nice fit. This is a double AAA holder. You will have to do some searching to find this at a reasonable price. I have seen prices up to € 4,50. This one costs € 0,35.

The holder does not hold very well with glue. I needed two extra strips to get some structural strength. I also sanded the bottom of the holder. It was not not completely flat.






